MDG were appointed by Faithful+Gould to provide a full contingent of RIBA stages to assist in the general improvement of facilities and infrastructure at HMP Coldingley, the specific improvement works consisted of Fire Safety Improvements, Night Sanitation and Window Replacement works.
Collectively the above, as well as some additional non-architectural improvements, provide the most significant and far-reaching investment since the Establishment was originally constructed in the late 60’s. The improvements aimed to tackle issues resulting in lack on investment both on the provision of suitable sanitation and infrastructure.
MDG are providing a lead technical advisor services to the project throughout the detailed design and construction phases.