daniel_wicks

DILYANA BECOMES MEMBER OF CHARTERED INSTITUTE

Everyone at MDG wants to wish a huge Congratulations to Dilyana, who has now received her official certificate confirming Membership to the Chartered Institute of Architectural Technologist. This is the culmination of months of hard work and interviews and all whilst working on one of the biggest commercial new build projects MDG has ever completed! …

DILYANA BECOMES MEMBER OF CHARTERED INSTITUTE Read More »

HMP COLDINGLEY – INFRASTRUCTURE IMPROVEMENTS

MDG were appointed by Faithful+Gould to provide a full contingent of RIBA stages to assist in the general improvement of facilities and infrastructure at HMP Coldingley, the specific improvement works consisted of  Fire Safety Improvements, Night Sanitation and Window Replacement works. Collectively the above, as well as some additional non-architectural improvements, provide the most significant …

HMP COLDINGLEY – INFRASTRUCTURE IMPROVEMENTS Read More »

WORKS TO BEGIN ON SITE FOR OFFICE FITOUT AT LEAMINGTON SPA

Following the completion of the white box fitout by the landlord, McCarthys are to take possession of the site to implement MDG Architects creative interior design. The project will transform two floors of the former House of Fraser into a new office for SUMO Group. It will house five individual studios and a generous communal …

WORKS TO BEGIN ON SITE FOR OFFICE FITOUT AT LEAMINGTON SPA Read More »

COTSWOLDS DISTILLERY BOTTLING HALL

This new two storey building accommodates the bottling and mixing room requirements of the distillery alongside the weighing and filling of barrels. The design of the Bottling Hall has taken its architectural cues directly from the existing adjacent warehouse. Its style can be described as an agricultural shed building constructed of Cotswold Stone to the …

COTSWOLDS DISTILLERY BOTTLING HALL Read More »

MDG COMPLETE PLANNING PROPOSALS FOR THROCKMORTON PARK

MDG Architects have completed planning proposals on behalf of Pinnacle, for 21 new sustainable modular-designed distribution units (Use class B8), at Throckmorton Industrial Park, Pershore. The application site, which is split over two phases, measures almost 40 acres (161,873m2). The units have been designed so they can be relocated in the future, so that the …

MDG COMPLETE PLANNING PROPOSALS FOR THROCKMORTON PARK Read More »